Loading...
R-1721-5-99RESOLUTION NO. 1721-5-99(R) ' A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF ALLEN, COLLIN COUNTY, TEXAS, AUTHORIZING A REIMBURSEMENT AGREEMENT (PRO - RATA) FOR OFF-SITE IMPROVEMENTS TO THE VILLAGES AT MAXWELL CREEK SUBDIVISION; AND PROVIDING AN EFFECTIVE DATE. WHEREAS, a developer sometimes needs to cross property of others to install water or sanitary sewer facilities to a new development; and, WHEREAS, a developer needs to recover his costs for these off-site facilities that must be in place for the owner of the off-site land to develop his property in the future; and, WHEREAS, the City will agree to collect the funds from other developers at the time of platting to reimburse the developer that installed the off-site improvements; NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ALLEN, COLLIN COUNTY, TEXAS: SECTION 1: That the City Manager is hereby authorized to enter into a reimbursement agreement for off-site improvements to the Villages at Maxwell Creek Subdivision which will include $54,744.70 for a twelve -inch water line in Malone Road, $84,648.50 for a sanitary sewer metering station on Malone Road, $80,137.47 for a sanitary sewer force main from the lift station to the metering station on Malone Road, . $61,643.38 for a twelve -inch water main on Bethany Road, all of which are shown in Exhibit "A" attached hereto. SECTION 2. This Resolution shall become effective immediately from and after its passage DULY PASSED AND APPROVED BY THE CITY COUNCIL OF THE CITY OF ALLEN, COLLIN COUNTY, TEXAS, ON THIS THE 6TH DAY OF MAY, 1999. ATTEST: J dy Mo on, CMC, CITY SECRETARY APPROVED: Stephen Terrell, MAYOR EXHIBIT A ' i Metering Station 11 Cost Items Parshall Flume & Shelter Structure t LS $44,324.25 Electrical Equipment Installation 1 IS $33,324.25 Engineering S 7000.00 Total $84,648.50 Distribution of Cost Area Owner Acres %Total Amount 1. Sowell 64.40 15.77 $13,349.08 2. Terra 76.08 18.61 $15,753.08 3. Martin 67.10 16.43 $13,907.75 4. Reid 64.00 15.67 $13,264.42 5a. Shelley 30.08 7.35 $ 6,721.66 5b. Shelley 38.54 9.44 $ 7,990.82 6. AISD 28.92 7.08 $ 5,993.11 7. Bedell 39.41 2.41 f 8.168.58 100°/a $84,648.50 Resolution No. 1721-5-99 IM A 9�) § ,l:almE§y; §eaee33@e __ _� r „ |:f 6d §m I (x !� / oa ZR () § �. : \ ,l:almE§y; §eaee33@e __ _� r „ 6d k 0 F 1 EXHIBIT A Force Main Com 12" PVC (DR -18) 2,519 LF. $57,433.20 12" PVC (FR -18) 102 L.F. $ 2,325.60 DI Bends for 12" 4 ea. $ 6,000.00 4' Diameter Manhole 2 ea. $ 3,100.00 8' Diameter Drop Manhole 1 ea. $ 1,950.00 System Testing 2,621 L.F. $ 2,280.27 Trench Safety 2,621 LF. $ 1,048.40 Engineering $ 6.000.00 Total $80,137.47 Distribution of Cost Area Owner Acres %Total Amount 1. Sowell 698.5 17.45 $13,983.99 2. Tera 64.40 20.60 $16,508.33 3. Martin 67.10 18.18 $14,568.99 4. Reid 64.00 17.34 $13,895.84 5a. Shelley 30.08 8.15 $ 6,53120 5b. Shelley 38.54 10.44 $ 8,366.35 6. AISD 28.92 1& $ 6282.77 1000/6 $80,137.47 Resolution No. 1721-5-99 ` e er e EXHIBIT A Bethany Road Waterline 12" Water Line 40.6 L.F. $ 746.63 12" Water Line 1969 LF. $36,211.75 12" Fittings .92 Tons $ 2,760.00 12" M.J. Butterfly Value 2 ea. $ 3,000.00 8" M.J. Gate Value 1 ea. $ 675.00 6" M J. Gate Value 2 ea $ 1,150.00 Fire Hydrant w/ 6" Lead 2 ea. $ 3,100.00 Bore under Malone (at Tower Site) 1 ea. $ 4,000.00 Bore under Bethany (at southeast corner 1 ea. $ 4,000.00 of Bethany and Malone) EngineeringS0.00 4 6 � Total $61,643.38 Di Area Owner Frontage (L.F.) %Total Amount 1. Sowell 698.5 18.17 $11,200.60 2. Terra 1074.44 27.94 $17,223.16 3. Martin 232.27 6.04 $ 3,723.26 4. Horton 885.51 23.03 $14,196.47 5. Bedell 954.22 79,$2 229. 1000/0 $61,643.38 Resolution No. 1721-5-99 |� )\ Es Ao ) \ F § § .�- ; j : \ § � � | 4� A ] k§§{\\§ §eeeee I E Cost Items 12" Waterline (PVC) 12" Valve (MJ. Gate Valve) 8" Valve (M J. Gate Valve) 6" Valve (MJ. Gate Valve) Fire Hydrant with MJ. Gate Valve Fittings 8" Stub Engineering EXHIBIT A Malone Road Water 1230 L.F. 5 ea. 3 ea. 2 ea 2 ea. 2.4 tons 4 ea. Total Distribution of Cost Area Owner Frontage (L.F.) % Total $22,619.70 $7,500.00 $2,025.00 $1,150.00 $4,250.00 $7,200.00 $5,000.00 $54,744.70 Amount 1. Sowell 1051.58 48.7 $26,660.67 2. Bedell 1108.08 51.3 $28.084.03 100% $54,744.70 Resolution No. 1721-5-99 ____O_. .,,0. 0 0 0 MW � § �f < .� )a §Li § ' . ) � | � •�- ; ; .MM \ : � � �� \ ■ J . #R fig\ §;2\ j to r " , wee ____O_. .,,0. 0 0 0