HomeMy WebLinkAboutR-1721-5-99RESOLUTION NO. 1721-5-99(R)
' A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF ALLEN, COLLIN
COUNTY, TEXAS, AUTHORIZING A REIMBURSEMENT AGREEMENT (PRO -
RATA) FOR OFF-SITE IMPROVEMENTS TO THE VILLAGES AT MAXWELL
CREEK SUBDIVISION; AND PROVIDING AN EFFECTIVE DATE.
WHEREAS, a developer sometimes needs to cross property of others to install water or sanitary sewer
facilities to a new development; and,
WHEREAS, a developer needs to recover his costs for these off-site facilities that must be in place for the
owner of the off-site land to develop his property in the future; and,
WHEREAS, the City will agree to collect the funds from other developers at the time of platting to
reimburse the developer that installed the off-site improvements;
NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ALLEN,
COLLIN COUNTY, TEXAS:
SECTION 1: That the City Manager is hereby authorized to enter into a reimbursement agreement for
off-site improvements to the Villages at Maxwell Creek Subdivision which will include $54,744.70 for a
twelve -inch water line in Malone Road, $84,648.50 for a sanitary sewer metering station on Malone Road,
$80,137.47 for a sanitary sewer force main from the lift station to the metering station on Malone Road,
. $61,643.38 for a twelve -inch water main on Bethany Road, all of which are shown in Exhibit "A" attached
hereto.
SECTION 2. This Resolution shall become effective immediately from and after its passage
DULY PASSED AND APPROVED BY THE CITY COUNCIL OF THE CITY OF ALLEN, COLLIN
COUNTY, TEXAS, ON THIS THE 6TH DAY OF MAY, 1999.
ATTEST:
J dy Mo on, CMC, CITY SECRETARY
APPROVED:
Stephen Terrell, MAYOR
EXHIBIT A
' i Metering Station
11
Cost Items
Parshall Flume & Shelter Structure
t LS
$44,324.25
Electrical Equipment Installation
1 IS
$33,324.25
Engineering
S 7000.00
Total
$84,648.50
Distribution of Cost
Area Owner
Acres
%Total
Amount
1. Sowell
64.40
15.77
$13,349.08
2. Terra
76.08
18.61
$15,753.08
3. Martin
67.10
16.43
$13,907.75
4. Reid
64.00
15.67
$13,264.42
5a. Shelley
30.08
7.35
$ 6,721.66
5b. Shelley
38.54
9.44
$ 7,990.82
6. AISD
28.92
7.08
$ 5,993.11
7. Bedell
39.41
2.41
f 8.168.58
100°/a
$84,648.50
Resolution No. 1721-5-99
IM
A
9�)
§
,l:almE§y;
§eaee33@e
__
_�
r
„
|:f
6d
§m
I
(x
!�
/
oa
ZR
()
§
�.
:
\
,l:almE§y;
§eaee33@e
__
_�
r
„
6d
k
0
F
1
EXHIBIT A
Force Main
Com
12" PVC (DR -18)
2,519 LF.
$57,433.20
12" PVC (FR -18)
102 L.F.
$ 2,325.60
DI Bends for 12"
4 ea.
$ 6,000.00
4' Diameter Manhole
2 ea.
$ 3,100.00
8' Diameter Drop Manhole
1 ea.
$ 1,950.00
System Testing
2,621 L.F.
$ 2,280.27
Trench Safety
2,621 LF.
$ 1,048.40
Engineering
$ 6.000.00
Total
$80,137.47
Distribution of Cost
Area Owner
Acres
%Total
Amount
1. Sowell
698.5
17.45
$13,983.99
2. Tera
64.40
20.60
$16,508.33
3. Martin
67.10
18.18
$14,568.99
4. Reid
64.00
17.34
$13,895.84
5a. Shelley
30.08
8.15
$ 6,53120
5b. Shelley
38.54
10.44
$ 8,366.35
6. AISD
28.92
1&
$ 6282.77
1000/6
$80,137.47
Resolution No. 1721-5-99
`
e
er
e
EXHIBIT A
Bethany Road
Waterline
12" Water Line
40.6 L.F.
$
746.63
12" Water Line
1969 LF.
$36,211.75
12" Fittings
.92 Tons
$
2,760.00
12" M.J. Butterfly Value
2 ea.
$
3,000.00
8" M.J. Gate Value
1 ea.
$
675.00
6" M J. Gate Value
2 ea
$
1,150.00
Fire Hydrant w/ 6" Lead
2 ea.
$
3,100.00
Bore under Malone (at Tower Site)
1 ea.
$
4,000.00
Bore under Bethany (at southeast corner
1 ea.
$
4,000.00
of Bethany and Malone)
EngineeringS0.00
4
6 �
Total
$61,643.38
Di
Area
Owner
Frontage (L.F.)
%Total
Amount
1.
Sowell
698.5
18.17
$11,200.60
2.
Terra
1074.44
27.94
$17,223.16
3.
Martin
232.27
6.04
$ 3,723.26
4.
Horton
885.51
23.03
$14,196.47
5.
Bedell
954.22
79,$2
229.
1000/0
$61,643.38
Resolution No. 1721-5-99
|�
)\
Es
Ao
) \
F
§ §
.�-
; j
: \
§
�
�
|
4�
A ]
k§§{\\§
§eeeee
I
E
Cost Items
12" Waterline (PVC)
12" Valve (MJ. Gate Valve)
8" Valve (M J. Gate Valve)
6" Valve (MJ. Gate Valve)
Fire Hydrant with MJ. Gate Valve
Fittings
8" Stub
Engineering
EXHIBIT A
Malone Road
Water
1230 L.F.
5 ea.
3 ea.
2 ea
2 ea.
2.4 tons
4 ea.
Total
Distribution of Cost
Area Owner Frontage (L.F.) % Total
$22,619.70
$7,500.00
$2,025.00
$1,150.00
$4,250.00
$7,200.00
$5,000.00
$54,744.70
Amount
1. Sowell 1051.58 48.7 $26,660.67
2. Bedell 1108.08 51.3 $28.084.03
100% $54,744.70
Resolution No. 1721-5-99
____O_. .,,0.
0 0 0
MW �
§ �f
< .�
)a
§Li
§
'
.
)
� |
�
•�-
;
;
.MM
\
:
� �
�� \
■
J .
#R
fig\
§;2\
j
to
r
"
,
wee
____O_. .,,0.
0 0 0