HomeMy WebLinkAboutMin - City Council - 1993 - 04/27 - WorkshopPresent:
Joe Farmer, Mayor
Councilmembers•
Kevin Lilly, Mayor Pro Tem
Mickey Christakos
David Bishop
Mike Nichols
Steve Terrell
Sharon Hamner
City Staff:
Jon McCarty, City Manager
Judy Morrison, City Secretary
Proponents:
Richard Ferrara, President, Richard Ferrara Architect, Inc.
Marcie Diamond, Staff Planner, Richard Ferrara Architect, Inc.
Bruce Smith, President, Arvida
Call to Order and Announce a Oumum is Present (Agenda Item I)
With a quorum of the Councilmembers present, the special called workshop of the Allen City Council
was called to order by Mayor Farmer at 7:07 p.m. on Tuesday, April 27, 1993, in the Council Chambers of the
Allen Municipal Annex, One Butler Circle, Allen, Texas.
Workshop: Twin Creeks Zoning Proposal
(Agenda Item ID
A recap by Jon McCarty, City Manager, of the last meeting was made in order for both the City and the
proponent to review the understandings of the issues previously discussed.
ALLEN CITY COUNCIL
ti
SPECIAL CALLED WORKSHOP
APRIL 27, 1993
COUNCIL CHAMBERS
ALLEN CITY HALL
ONE BUTLER CIRCLE
Present:
Joe Farmer, Mayor
Councilmembers•
Kevin Lilly, Mayor Pro Tem
Mickey Christakos
David Bishop
Mike Nichols
Steve Terrell
Sharon Hamner
City Staff:
Jon McCarty, City Manager
Judy Morrison, City Secretary
Proponents:
Richard Ferrara, President, Richard Ferrara Architect, Inc.
Marcie Diamond, Staff Planner, Richard Ferrara Architect, Inc.
Bruce Smith, President, Arvida
Call to Order and Announce a Oumum is Present (Agenda Item I)
With a quorum of the Councilmembers present, the special called workshop of the Allen City Council
was called to order by Mayor Farmer at 7:07 p.m. on Tuesday, April 27, 1993, in the Council Chambers of the
Allen Municipal Annex, One Butler Circle, Allen, Texas.
Workshop: Twin Creeks Zoning Proposal
(Agenda Item ID
A recap by Jon McCarty, City Manager, of the last meeting was made in order for both the City and the
proponent to review the understandings of the issues previously discussed.
ALLEN CITY COUNCIL
SPECIAL CALLED WORKSHOP
APRIL 27, 1993
Amendment to City's Thoroughfare Plan
PAGE
° To maintain LOS C (Level of Service C) on west side, developers have demonstrated the need
for the Exchange Extension
° Grade separation at SH 121 is an issue to be decided later in consultation with neighboring
jurisdictions—roadway capacity is needed with or without the overpass
° Proposal includes, as required for LOS C, eight lanes at both US 75 and SH 121 with six lanes
in between and SRA median cut limits
° Proponents have verbally committed to assist in working with other entities for SH 121 grade
separation
The impact of all adjacent property owners from Alma Drive to SH 121 with the extension of Exchange
Approval by Council requires incurring additional costs as well as enforcing requirements on
property owners not a part of this proposal which is necessary to maintain LOS C
Final design of the golf course to be addressed by Council through site planning process
o Proposal has been altered by proponents to include a minimum of 150 feet of land dedicated
(owned) to the City on each side of Rowlett Creek
As proposed, this amendment removes responsibility of developer to design or construct the hike
and bike trail
Reconfigured golf course removes all golf holes from inside of west Rowlett Creek
With this amendment, developer no longer required to bring forward a site plan as contained in
Planning and Zoning recommendation
Facilities Agreement imposed upon developer
Developer wants assurances that if federal or state funding is received for any of the
thoroughfares, they will be relieved of financial responsibility or reimbursed for all but the local
share
Developer has not committed to accelerate construction on our thoroughfares
There is not currently an enforceable statement in the proposal that a golf course will be built at time of
construction
EE'; Proponent has agreed to prepare more precise wording to address this issue to our satisfaction
as long as they have some flexibility because of weather or other uncontrollable delay factors
ALLEN CITY COUNCIL
SPECIAL CALLED WORKSHOP
APRIL 27, 1993 PAGE 3
Richard Ferrara, Richard Ferrara Architect, Inc., suggested the following wording to be included in the
proposal:
"The golf course be completed within thirty months from the date of approval of the Phase I
Plat."
The proponent discussed the several issues dealing with park dedication. Richard Ferrara revealed and
discussed a new park dedication concept plan with the Council and indicated that the earlier 28 -acre private park
would be divided into part private/part public with the public area to include two soccer fields and two lighted
ball fields including parking, irrigation and landscaping. The proponents also discussed the Baptist Encampment
adjacent to several small park dedications in the proposal. Negotiations are being made regarding this piece of
property.
The proponents suggested the newly revealed 11 -acre public park site would satisfy 1,545 units according
to the park dedication ordinance with 2,505 remaining at $130 per unit which would be approximately $325,000.
Discussion was held regarding credit being given to the proponents for the actual construction of the hike and
bike trails along Rowlett Creek and Watters Branch and the ballfields' cost of construction. It was also agreed
that if the proponents were unsuccessful in attempts to address the Baptist Encampment property, the three parks
adjacent to that area would be readdressed and a solution worked out with the City and the proponents.
Discussion was held regarding the timing and the cost of the community park area option. At the present
time, there is a seven-year time limit or when Exchange is under construction.
Comprehensive Plan density issues
Agreement was reached on this item between proponents and the City
Private club by right
Council felt this was appropriate
Discussion was held regarding the limitation placed on the density of hotels. Council will review this
item and bring forth a recommendation to be included in documents at the May 6 meeting along with any other
changes. Council requested from Staff more complete dollar figures with regard to the park dedication fee trade-
off. Also, to be reviewed is wordage regarding contingency on parks adjacent to the Baptist Encampment if
negotiations fail.
It was felt that the construction timing of McDermott Road will be a major issue in the future with the
planning of this development. It was also suggested that the commercial/industrial area of this development be
pursued very intently
Items of Interest to the Council (Agenda Item III)
IThere were no items of interest to the Council.
ALLEN CITY COUNCIL
SPECIAL CALLED WORKSHOP
APRIL 27, 1993
Adwourn
PAGE 4
(Agenda Item IV)
MOTION: Upon a motion made by Councilmember Nichols and seconded by Councilmember Bishop, the
Council voted seven (7) for and none (0) opposed to adjourn the special called workshop of the
Allen City Council at 9:22 p.m., on Tuesday, April 27, 1993. The motion carried.
These minutes approved on the 6th day of May-, 1993.
APPROVED:
7 JGP TCZ� ..«trt
,toe Farmer, MAYOR
ATTEST:
i
U -
Jud orris y CITY SECRETARY
it