HomeMy WebLinkAboutMin - Parks and Recreation Board - 2000 - 09/11 - RegularMINUTES
PARKS AND RECREATION BOARD
REGULAR CALLED MEETING
SEPTEMBER 11, 2000 — 7 P.M.
PARB MEMBERS PRESENT
Lm Waldbauer, Chair
Anne Campbell, Secretary
Chen Jones
Kevin Pierce, Vice -Chair
Vicki Wester
Ben Ferguson
Scott Neice
MEMBERS ABSENT
None
STAFF PRESENT
Don Horton, Director
Tim Dentler, Park Services Manager
Larry Kirk, Recreation Services Manager
Brian Bristow, Landscape Architect
Sue Witkowski, Secretary
GUESTS
None
7 P.M. — PRE -MEETING WORKSHOP:
I. CALL TO ORDER
Chair Jim Waldbauer called the meeting to order at 7:06 p.m.
2. QUESTIONS ON CURRENT AGENDA
No questions were brought forth at this time
I
Page 2
Parks and Recreation Board Meering
September 11, 2000
3. OPEN FORUM — REVIEW OF ATHLETIC COMPLEX/COMMUNITY
PARK MASTER PLAN
Brian Bristow reviewed the issues discussed at our last Park Board Meeting with
the Board, outlining issues and responses to traffic, an additional restroom facility,
parking lot access, ball field locations, reduced water feature. Following a brief
discussion, it was pointed out that "dotted line" overlays on the amphitheater
grass area could show potential usage of this open space when not being utilized
for special events.
The Board was told that Bonds would be sold next year for this project, and that
the athletic fields might be open for usage in the fall of 2002.
7:30 P.M. — REGULAR MEETING:
4. APPROVE MINUTES FROM AUGUST 14, 2000 REGULAR CALLED
MEETING
MOTION: Anne Campbell moved to accept the Minutes from August 14,
2000 Regular Called Meeting as presented. Vicki Wester seconded,
and the Motion tamed 7 for, 0 against.
5. CITIZENS COMMENTS
The following citizens came forward to speak regarding the Community Park:
Tim Wooldridge
1544 Harvest Run
Allen, TX 75002
(972)390-9223
Mr. Wooldridge presented the Board with a list of his requests, and those are
highlighted as follows:
Remove plans to host Allen USA Celebration at this site
Remove the planned soundstage and amphitheater
Address the issue of increased auto traffic on residential streets and on
Malone Road
Address the issue of increased pedestrian traffic within the area
Mr. Rich Haggerty
1544 Hickory Trail
Page 3
Parks and Recreation Board Meeting
September It, 2000
Allen, TX 75002
(972)359-0244
Mr. Haggerty confirmed that Malone will be a two-lane road, but that it will be
widened. He also questioned the frequency of concerts being held at this site.
Mr. Haggerty expressed concern regarding the ball field lights and the impact
upon his personal residence.
Mr. Tim Geil
1316 Bethany Creek Blvd
Allen, TX 75002
(972) 727-7746
Mr. Geil thanked the Department for removing the old storage facility at Bethany
Lakes Park, and thanked the Board for adding the potential field usage overlays to
the Master Plan. Mr Geil indicated that the Allen USA Celebration should be
relocated to another facility He felt that should be an athletic complex with as
many soccer fields as possible. Mr. Geil also requested that the grade on the grass
area in front of the band shell be kept to as flat a surface as possible.
6. ATHLETIC COMPLEX/COMMUNITY PARK MASTER PLAN
RECOMMENDATION TO CITY COUNCIL
Mr. Don Horton suggested that the Clark Condon Associates be required to hire
an acoustics consultant to evaluate the issue of noise and different opportunities
for controlling the level of noise from bands and concerts. The Board agreed this
would be an opportunity to evaluate the potential usage of berms and plant
materials.
It was also suggested that the trees east of the potential tennis courts be relocated
to leave more open space, and that pavers in the street at Malone and Rivercrest
might help with pedestrians crossing over into the park. Stop signs may be
required in the future. A discussion was held regarding a third bathroom facility
being added.
MOTION: Scott Neice moved to recommend the adoption of a Master Plan
for the Athletic Complex/Community Park located at Malone and
Angel Parkway as presented by staff with the following
modifications: 1) revisit tree plan at western end of open space: 2)
use pavers signifying pedestrian crossing at Rivercrest and Malone;
3) add a third restroom facility; 4) enlist an acoustics consultant;
and 5) outline potential usage areas in open space area. Vicki
Wester seconded and the Motion carried 7 for, 0 against.
Page 3
Parks and Recreation Board Meeting
September 11, 2000
7. DISCUSSION ON PARK NAMING POLICY
After briefly reviewing the Park Naming Policy included in the Board packets, it
was determined that a subcommittee should be formed to look at the policy and
also work with staff to name the two parks currently under construction in the
Lost Creek Development. Kevin Pierce and Chen Jones agreed to serve on this
subcommittee and work with staff.
S. NEIGHBORHOOD PARK SERVICE AREAS (INTRODUCTION)
Don Horton reviewed the map of the City with the Board, pointing out areas that
currently are not being served with parkland close to their homes. He volunteered
to take a van -tour with the Board members and physically visit each of the areas
and discuss alternatives. The Board agreed to this plan
9. OTHER BUSINESS
Review Of Board Work Plan — Jim Waldbauer
Jim Waldbauer indicated he had drafted an "Annual Report to City Council' for
the Board, and staff would be reviewing that document. It was also discussed that
the time might be good to do a survey from the Joe Farmer Recreation Center.
Staff will be putting together some ideas for survey questions.
National Parks And Recreation Association Annual Conference
A brief discussion was held on the National Conference and those who would be
attending, along with opportunities for Board and Commissions to attend sessions
while there.
10. ADJOURN
There being no further business, the meeting was adjourned at 9:30 p.m.
These minutes read and approved this 13th day of November, 2000.