Loading...
R-3489-6-17RESOLUTION NO. 3489-&17(R) ' A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF ALLEN, COLLIN COUNTY, TEXAS, ESTABLISHING FIRE CONSTRUCTION PERMIT FEES AS AUTHORIZED BY THE CODE OF ORDINANCES; AND PROVIDING FOR AN EFFECTIVE DATE. WHEREAS, the City Council of the City of Allen, Texas requires all persons performing related work located in the City of Allen to submit applications and obtain permits pursuant to the International Fire Code of ordinances; and, WHEREAS, the City Council desires to establish the fees and charges, as set forth herein. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ALLEN, COLLIN COUNTY, TEXAS, THAT: SECTION 1. The City Council hereby establishes the following permit fees and charges for the installation or modification to systems and equipment for which a permit is required by code: 1. Construction Permit Fees. (a) 0-100,000 square feet $0.02 per square foot of building area $60.00 minimum (b) 100,001-300,000 square feet $2,000 for the first 100,000 square feet. Plus an additional $0.017 for each additional square foot or fraction thereof (c) 300,001 + square feet $5,400 for the first 300,000 square feet. Plus an additional $0.01 for each additional square foot or fraction thereof (d) Fire Sprinkler Modification (under 20 heads $60.00 e Fire Alarm Modification $60.00 Fire Alann Water Flow Monitoring $60.00 2. Other Permit Fees. a Access Controls stems $60.00 Flow Test No Fee c Fire Pump $60.00 d Hazardous Materials $60.00 e Tem Residential $60.00 Clean Agent $60.00 Pyrotechnics $60.00 h Hood Suppression System $60.00 i Gate Access System $60.00 1" Gate, $30.00 each additional Q) Flammable Combustible Liquid Tank $160.00 for the fust tank, $60.00 for each additional tank k Underground Fire Main/Remote FDC $100.00 per main 1 Rack Storage $60.00 (m) Fuel Dispensing System $160.00 for the fust tank, $60.00 for each additional tank (n) Cryogenics $160.00 for the first tank, $60.00 for each additional tank I (o) Generator 160.00 for the first unit, $60.00 for each additional unit Open Burning $1,000(per da /site Smoke Control & Exhaust Systems $60.00 r LP -Gas $60.00 s Industrial ovens $60.00 t Solar photovoltaic power systems $60.00 u Spraying or dipping $60.00 3. Construction Permit Re -Inspection Fees and After Hours Inspection Fees. (a) First scheduled inspection (during normal business hours No charge 6 10 inspection $50.00 c 2nd re -inspection $75.00 d 3r° and subsequent reinspection $100.00 (e) After -Hours Inspections (Before 8 AM or After 5PM— Monday through Friday: All hours on Weekends $75.00 per hour with a two hour minimum charge" SECTION 2. Resolutions of the City of Allen, Collin County, Texas, in conflict with the provisions of this resolution be, and the same are hereby, repealed; provided, however, that all other provisions of said resolutions not in conflict with the provisions of this resolution shall remain in full force and effect. SECTION 3. This Resolution shall become effective immediately from and after its passage, provided, however, ' the fees and charges established herein shall take effect on its passage. DULY PASSED AND APPROVED BY THE CITY COUNCIL OF THE CITY OF ALLEN, COLLIN COUNTY, TEXAS, ON THIS THE 27m DAY OF JUNE 2017. APPROVED: Stephe Terrell, MAY R ATTEST: 4She ey B. Geo FFY SEC ARY (PGS:5.10-17J6.85839) Resolution No. 3489-6-17(R), Page 2